The second phase of line 2 of Panama metro has been successfully completed with a total of 16 stations.
For cladding these stations we have been used the standing seam system with aluminum sheets, system that ensures the water tightness and durability of the work, with polycarbonate skylights.
The roofs have lifelines and walkways to ensure good maintenance with maximum safety.